+1 (868) 622 7402 Mon-Fri 7:30 a.m. – 4:30 p.m. (AST) 39 Long Circular Road, St. James Port-of-Spain, Trinidad 180104
Fully Integrated
Construction Expertise
Trusted Regional
Leader
Client-centric
Approach
Contact Us

Bon Air North Housing Development, Trinidad

Project:Bon Air North Housing Development, Trinidad
Client:Trinidad and Tobago Housing Development Corporation (HDC)
Location:Pine Ridge Heights, Arouca, Trinidad
Contract Type:FIDIC Design-Build 1999 (Yellow Book)
Scope:Design & Build of 354 residential units and infrastructure. Phase 1 – 22no. Duplex Townhouses (44 units) 4no. 2 Bedroom Apartment Block (48 units) Phase 2A – 7no. Quadruplex Townhouses (28 units) 15no. Duplex Townhouses (30 units) Phase 2B – 3no. 3 Bedroom Apartment Blocks (48 units) Phase 3 – 12no. Quadruplex Townhouses (48 units), 2no. Duplex Townhouses (4 units) and 6no. 3 Bedroom Apartment Blocks (104 units). Super-Structure: Cast-in-place reinforced concrete superstructure using the FORSA aluminium formwork system. Sub-Structure: Post-Tensioned system for foundation and ground floor slab. Our scope included all building and external infrastructure services and civil works: extensive cut and fill; potable water and sewerage network; stormwater drainage and detention ponds; roadways; underground electrical and telecommunication network.
Start Date:2014
Completion Date:Phase 1 – 2017 Phase 2A – 2018 Phase 2B – In progress Phase 3 – In Progress